Interconnection Checklist For Member-Owned Renewable Generation Systems (RGS)

When submitting final interconnection agreement, the following requirements must be met:

Documents required
  • Complete the online forms including the Interconnection Agreement for Member-Owned RGS
  • Provide proof of insurance in accordance with Interconnection Agreement for Member-Owned RGS page 3, Article 8 (not applicable if 10kW or less)
  • Enclose (1) copy of your one-line diagram
Other requirements
  • Lockable alternating current disconnect; clearly labeled, within five feet of the meter can, mounted separately from the meter socket and inverter
  • Member is responsible for entire energy consumption including situations where meter configurations are incorrectly installed
Important information
  • SECO Energy does not guarantee the projected value of electricity produced by these systems. Changes in rates, rate structures, or net-metering policy could affect this value and current practices will not be grandfathered.
×